Charge pipes

The charge pipes have been provisionally laid in place with silicon hose and tape.

This will help us with plumbing in our fluid lines.

20120321-181654.jpg

20120321-181715.jpg

Advertisements

FITTINGS!!!

It’s Christmas in March!!!

The beginnings of our Goodridge fittings have arrived!

… Let’s plumb.

20120321-175507.jpg

Interior coming along

The interior is coming along well, the prepreg carbon fiber side panels are finished and will soon be fitted once the dash board is finally in place.

A mock dash unit has been made up and test fitted, and some carbon sill covers with traction tape have been set in place.

20120321-105748.jpg

20120321-105951.jpg

20120321-110011.jpg

20120321-110038.jpg

Water pump

Our Davies Craig electric water pump has arrived and is ready to be fitted!

20120321-105047.jpg

20120321-105120.jpg

20120321-105106.jpg

20120321-105151.jpg

New stuff!!!

Our Fuel Lab pressure reg., Bosch fuel pump, in-line fuel filter and dry break fuel filler have all arrived!
Perfect timing, now they can be set in place to aid the planning of the engine bay plumbing process!

20120321-082614.jpg

20120321-082634.jpg

20120321-082729.jpg

20120321-082847.jpg

Lightening the door hinges

A sneak peak of the door hinges being milled down.

20120308-115114.jpg

Oil tank fully mounted

The dry sump oil tank has been trimmed and mounted. This is where it will finally sit.

Plastic bushes as well as foam pads have been used to reduce wear and tear cause by vibrations.

What does everyone think?

20120308-114743.jpg

20120308-114804.jpg

20120308-114817.jpg