Bulkhead Fitted and Bonded

After carefully cutting the bulkhead to shape using the accurate but time consuming cardboard templates, the bulkhead has been bonded into position.

The join between the two halves has been perfectly aligned and with the carbon weave pattern seamlessly mated in preparation for the heat shielding to be applied to the engine bay side.

Advertisement
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.